The Bathroom Project
Fall/Winter/Spring 2004/2005.
Notable Facts:
Project start: October 16, 2004
Project end: April 23, 2005
Total Duration: 190 days
Number of days without a bathroom sink: 137
Number of days without a shower/tub: 28
Number of days without a toilet: 7 (OUCH!)
Approximate weight of old tub that was removed: 400 lbs
Approximate weight of demolition debris removed: 2700 lbs
Cost to dump demolition debris: $174.76
Number of floor joists that needed repair: 4 (of 5)
Layers of wall that were found and removed: 3-4
Number of wall/ceiling/floor surfaces that are level/plumb: 0
Percentage of plumbing that was redone: 100%
Number of tiles used for tub/shower surround: 553
Before and After Comparisons
(< click):
Vanity area
Sink
Toilet
Tub/shower
Toilet paper holder, etc.
Some In-Progress Photos
(< click)
:
Floor joists
Sink wall
Glass block wall
Custom cabinet
Other After Photos
(< click)
:
Shower tile
Shower marble detail
Window area
Custom cabinet
A True Throne