Remodel 2006
Spring/Summer/Fall/Winter 2006.
The Plan We completely gutted the first floor of our two-story row house. We modified the layout, which includes the living room and the kitchen. Walls were taken down, including a load-bearing wall. This wall was replaced with a beam. We enlarged the living room space and resized the kitchen, while making it more user-friendly. The new floor plan is more open with some neat architectural features (e.g., see the pimpin' video over there) . There are all new kitchen cabinets and countertops too! Oh, and did I mention, we never moved out!!!! Fun Facts
Who's Who GC: Sean Demo: Team McRow (Rich, Ginger, Jess, Tim, & Sean) Framing: Big D and his amazing crew Finish carpentry / work / specials: Sean HVAC: Excel Mechanical, Sean Plumbing: Romano Company Electrical: Stephen Electric Kitchen: design, Carole Kitchen and Bath; install, Sean Thanks! Cris and Jack (design ideas) Jen and Andreas J. (food and dog-sitting) Luis (structural guidance) Rich, Ginger, and Tim (demo help) Megan Z. (food and dog-sitting) Patrick (architectural drawings, structural guidance) Paul (contractor referrals and specialized assistance) |
Pimpin' the kitchen
|