Remodel 2006
Spring/Summer/Fall/Winter 2006.
The Plan We completely gutted the first floor of our two-story row house. We modified the layout, which includes the living room and the kitchen. Walls were taken down, including a load-bearing wall. This wall was replaced with a beam. We enlarged the living room space and reduced the size of the kitchen. The new floor plan is more open with some neat architectural features. There are all new kitchen cabinets and countertops too! Fun Facts
Who's Who GC: Sean Demo: Team McRow (Rich, Ginger, Jess, Tim, & Sean) Framing: Big D and his amazing crew, Sean HVAC: Excel Mechanical, Sean Plumbing: Romano Company Electrical: Stephen Electric Kitchen: Carole Kitchen and Bath, Sean Thanks! Cris and Jack (design ideas) Jen and Andreas J. (food and dog-sitting) Luis (structural guidance) Rich, Ginger, and Tim (demo help) Megan Z. (food and dog-sitting) Patrick (architectural drawings, structural guidance) Paul (contractor referrals and specialized assistance) |
|