The Bathroom Project

Fall/Winter/Spring 2004/2005.

Notable Facts:
  • Project start: October 16, 2004
  • Project end: April 23, 2005
  • Total Duration: 190 days
  • Number of days without a bathroom sink: 137
  • Number of days without a shower/tub: 28
  • Number of days without a toilet: 7 (OUCH!)
  • Approximate weight of old tub that was removed: 400 lbs
  • Approximate weight of demolition debris removed: 2700 lbs
  • Cost to dump demolition debris: $174.76
  • Number of floor joists that needed repair: 4 (of 5)
  • Layers of wall that were found and removed: 3-4
  • Number of wall/ceiling/floor surfaces that are level/plumb: 0
  • Percentage of plumbing that was redone: 100%
  • Number of tiles used for tub/shower surround: 553

Before and After Comparisons (< click):
  • Vanity area
  • Sink
  • Toilet
  • Tub/shower
  • Toilet paper holder, etc.

Some In-Progress Photos (< click):
  • Floor joists
  • Sink wall
  • Glass block wall
  • Custom cabinet

Other After Photos (< click)​:
  • Shower tile
  • Shower marble detail
  • Window area
  • Custom cabinet